알림
뒤로
알림 설정
뒤로
더보기
게시물 알림
내 글 반응
내가 작성한 게시물이나 댓글에 다른 사람이 댓글이나 답글을 작성하면 알려줍니다.
공지사항
사이트에서 보내는 중요한 공지를 실시간으로 알려줍니다.
Alarm
마이페이지
로그아웃
Home
R&D
2021~2022
Completed Project
Community
Notice
Q&A
Webhard
닫기
사이트 로고
Home
R&D
2021~2022
Completed Project
Community
Notice
Q&A
Webhard
site search
로그인 위젯 문구
MENU
사이트 로고
site search
Home
R&D
Community
Webhard
2021~2022
Completed Project
MESL R&D
SUN MOON University, Department of
M
echanical
E
ngineering,
S
imulation
L
aboratory
Completed Project
No. 1
Comparison of reaction force measurement with or without lens cushion of glasses frame
Optical
No. 2
Dynamic and modal analysis of facility structures
Semiconductor
No. 3
Vibration analysis of facility structures caused by earthquakes
Construction
No. 4
Developing a technology template for predicting the performance of the Rain gutter
Automobile
No. 1 (Optical)
No. 1 (Optical)
No. 2 (Semiconductor)
No. 2 (Semiconductor)
No. 3 (Construction)
No. 3 (Construction)
No. 4 (Automobile)
No. 4 (Automobile)
No. 5
Structural analysis of copper pipe joints
Plumbing
No. 6
Confirmation of structural safety according to the occurrence of gaps in the flange area
Plant
No. 7
Submarine cable FSI analysis by flow reaction force
Cable
No. 8
Dynamic behavior analysis with belt according to R-EPAS pulley material
Automobile
No. 5 (Plumbing)
No. 5 (Plumbing)
No. 6 (Plant)
No. 6 (Plant)
No. 7 (Cable)
No. 7 (Cable)
No. 8 (Automobile)
No. 8 (Automobile)
No. 9
Comparison of wastewater performance according to the inclination of the heat exchanger pipe
Plumbing
No. 10
Confirmation of structural safety of shell joint bolts
Plant
No. 11
Impact analysis of the internal bracket according to Drop Jig's fall
Optical
No. 12
Analysis of flow in the pipe according to the difference in viscosity
Plumbing
No. 9 (Plumbing)
No. 9 (Plumbing)
No. 10 (Plant)
No. 10 (Plant)
No. 11 (Optical)
No. 11 (Optical)
No. 12 (Plumbing)
No. 12 (Plumbing)
No. 13
Confirmation of sagging due to lifting of the battery case and suggestion of improvement
Tray
No. 14
Checking the uniform flow according to the cross head internal shape
Cable
No. 15
Analysis of fluid distribution and flow characteristics inside the dust collector
Dust collector
No. 16
Confirmation of safety of support structure according to VR simulator installation
Plant
No. 13 (Tray)
No. 13 (Tray)
No. 14 (Cable)
No. 14 (Cable)
No. 15 (Dust collector)
No. 15 (Dust collector)
No. 16 (Plant)
No. 16 (Plant)